As part of the traffic scheme enhancement, Sheares Avenue was realigned with the construction of new at-grade road. This enhancement offers a more direct connection between Sheares Avenue and the adjacent roads.
Prior to the works, project site office used for the construction of Marina Coastal Expressway, Marina Bay Golf Club Substation and a carpark were cleared away. Subsequently, new road alignment was set up with the construction of comprehensive drainage networks and other street furniture, such as road kerb, pedestrian footpath, railings, vehicular impact guardrails, signages and etc.
To connect to adjoining developments, existing carriageways were widened and reprofiled through overlaying and milling. Whilst the underlying courses of carriageway (i.e. road base and subbase) were constructed using recycled concrete aggregate, which was processed from the construction and demolition waste.
Besides, both rigid and semi-rigid pavement systems were introduced to withstand heavy and high traffic loads at the road intersections. Road markings were reinstated accordingly before opening to traffic.