Further to the establishment of road network, this project also involved the preparation works of 25-ha land, construction of 2.6-km drains with the width ranging from 0.75 m to 2.80 m, installation of 1.05-km sewer pipelines and other associated roadside facilities.
The project team took the initiative to work closely with other government agencies to resolve any potential maintenance issue and to make provisions for succeeding development with advanced construction. For instances, proposing to replace rigid pavement with semi-rigid pavement at junction for the ease of accessing to the existing underground water pipelines, embedding reserved pipe sleeves beneath the box drain at every land parcel for future connections of sewer pipelines and profiling suitable terrain for the erection of bus stops in time to come.